Qi = 4.25m3/s | H = 280m | Pi = 9.45 MW | Em = 41.2 GWh/ year
The project is part of harnessing the hydropower potential program promoted by the Government of Georgia
Study Seismic hazard study the hydrological, geological and geotechnical study, analysis of variants with choosing the optimal technical and economic
Develop Feasibility Study for optimum technical and economical solution.
Documentation submitted in March 2016.